noobwithatank Posted June 15, 2007 Share Posted June 15, 2007 so im pretty much waiting on a few pieces to get here from a online site, unions/ball valves and then the plumbing will be complete. oh man i didnt know what i was geting myself into. i just hope nothing leak when i glue it all. lol heres what im dealing with. Link to comment
BruiseAndy Posted June 16, 2007 Share Posted June 16, 2007 would suggest installing isolation valve before union on closed loop return. Link to comment
noobwithatank Posted June 16, 2007 Author Share Posted June 16, 2007 isolation valve ?? that is? Link to comment
MKNTRAXX Posted June 17, 2007 Share Posted June 17, 2007 isolation valve ??that is? Place a valve before the union.. That would allow you to remove pipe below union without you draining your tank below the closed loop intake Link to comment
noobwithatank Posted June 17, 2007 Author Share Posted June 17, 2007 Place a valve before the union.. That would allow you to remove pipe below union without you draining your tank below the closed loop intake ah the ballvalves..lol im waiting for those, the last piece then glue.. then water test... been waiting almot 8 months to get to this point! Link to comment
avalanche1201 Posted June 17, 2007 Share Posted June 17, 2007 id water test before you glue....dont wanna glue and have somethan leak and not be able to get it apart Link to comment
noobwithatank Posted June 17, 2007 Author Share Posted June 17, 2007 id water test before you glue....dont wanna glue and have somethan leak and not be able to get it apart wont it leak if i dont glue it tho? lol Link to comment
coolwaters Posted June 18, 2007 Share Posted June 18, 2007 why dont you just make it simple? one return one in-tank and maybe one emergency line. Link to comment